- 29/06/2001, the company purchased a residential premises at Samara, Avrory street, House 114A (case 2) 298.4 sq.m
- 14/03/2002, the company purchased a non-residential building under a production base at Samara, Industrial area, pos. South, 8, an area of 374.0 sq.m
- 21/01/2003, the company purchased a residential premises at Samara, Avrory street, House 114A (building 7) 553.9 square sq. m
17/02/2004, the company purchased a plot of land for the production area at Samara, Industrial area, pos. South, 8, an area of 1750.0 sq. m
11.07.2005, the Company purchased in the property the following properties: 1. Fencing the area 824.85 m 2. Floodlight towers 2pcs. 3. Guardhouse.
04/17/2006, to the 8-th anniversary, at the production facilities of the company, in industrial area of Samara, was finished the construction of administrative and industrial buildings, total area of 1842.2 sq. m
22/02/2007, the company purchased a plot of land for the production base: total area 32,346.8 sq. m, surrounded reinforced fence, which are real estate. The site is in close proximity to the Federal Highway at a distance of 900 meters from the boundary of Samara, at the Volga region, village Smyshlyaevka. The site has its own gas supply and electrical power.
16.04.2008, the company purchased ownership a land parcel of 1880,1 sq.m, at the address: 114A (block 2) Aurora Str., Samara city.
28.07.2008, the company purchased ownership a land parcel 2035,2 sq. m, at the address: 114A (block) Aurora Str., Samara city.
17.04.2009, in Samara city on 114 A (block 6) Aurora Street the construction of a new 4-storey block “Leader Engineering Centre” of a total 3377,8 sq.m. space was finished.
24.01.2011, the company perchased ownership 2 nonresidential premises of a total 756,8 square meters space at the address: 114A (block 3 and 4) Aurora Str., Samara city.
05.07.2011, the company purchased a transformer substation (37,7 sq.m space) with two transformers electric output of 330 kW/hour.
15.11.2011, the company purcased a land parcel of 991,0 sq.m space at the address: Energetic settlement, Volzhskiy region, in close proximity to the own production basis.
Currently under construction is the building of a new five-storey block “Leader Office center” of 2530,0 sq. m space situated at the address: 114A (block 2) Aurora Str.