Russia, 443079, Samara, Avrora st. 114

Phone: (846)

 266-66-66

Search

Assets and stocks

    • 29/06/2001,the company purchased a residential premises at Samara, Avrory street, House 114A (case 2) 298.4 sq.m
    • 14/03/2002, the company purchased a non-residential building under a production base at Samara, Industrial area, pos. South, 8, an area of ​​374.0 sq.m
    • 21/01/2003, the company purchased a residential premises at Samara, Avrory street, House 114A (building 7) 553.9 square sq. m

    • 17/02/2004, the company purchased a plot of land for the production area at Samara, Industrial area, pos. South, 8, an area of ​​1750.0 sq. m

      11.07.2005, the Company purchased in the property the following properties: 1. Fencing the area 824.85 m 2. Floodlight towers 2pcs. 3. Guardhouse.
    • 04/17/2006, to the 8-th anniversary, at the production facilities of the company, in industrial area of Samara, was finished the construction of administrative and industrial buildings, total area of ​​1842.2 sq. m

      22/02/2007, the company purchased a plot of land for the production base: total area 32,346.8 sq. m, surrounded reinforced fence, which are real estate. The site is in close proximity to the Federal Highway at a distance of 900 meters from the boundary of Samara, at the Volga region, village Smyshlyaevka. The site has its own gas supply and electrical power.

      16.04.2008,the company purchased ownership a land parcel of 1880,1 sq.m,at the address: 114A (block 2) Aurora Str., Samara city.

      28.07.2008,the company purchased ownership a land parcel 2035,2 sq. m,at the address: 114A (block) Aurora Str., Samara city.

      17.04.2009,in Samara city on 114 A (block 6) Aurora Street the construction of a new 4-storey block “Leader Engineering Centre” of a total 3377,8 sq.m.space was finished.

      24.01.2011,the company perchased ownership 2 nonresidential premises of a total 756,8 square meters space at the address: 114A (block 3 and 4) Aurora Str., Samara city.

      05.07.2011,the company purchased a transformer substation (37,7 sq.m space) with two transformerselectric output of 330 kW/hour.

      15.11.2011,the company purcased a land parcel of 991,0 sq.mspace at the address: Energetic settlement, Volzhskiy region, in close proximity to the own production basis.

      Currently under construction is the building of a new five-storey block Leader Office center of 2530,0 sq. mspace situated at the address: 114A (block 2) Aurora Str.

      Upward

Up